0.5.12 - ci-build
SpaceflightHealthSimulationsReferenceDocumentation - Local Development build (v0.5.12) built by the FHIR (HL7® FHIR® Standard) Build Tools. See the Directory of published versions
| Official URL: http://hl7.org/fhir/uv/aerospace/ValueSet/mars-missions-vs | Version: 0.5.12 | |||
| Active as of 2026-03-25 | Computable Name: MarsMissionsVS | |||
All Mars missions (robotic and human, completed and planned)
References
This value set is not used here; it may be used elsewhere (e.g. specifications and/or implementations that use this content)
http://hl7.org/fhir/uv/aerospace/CodeSystem/mars-missions-cs version 📦0.5.12
Expansion performed internally based on codesystem Mars Missions v0.5.12 (CodeSystem)
This value set contains 13 concepts
| System | Code | Display (en) | Definition | status | JSON | XML |
http://hl7.org/fhir/uv/aerospace/CodeSystem/mars-missions-cs | mariner4 | Mariner 4 (1964) | First successful Mars flyby mission, returned 21 images of Mars surface | completed | ||
http://hl7.org/fhir/uv/aerospace/CodeSystem/mars-missions-cs | mariner9 | Mariner 9 (1971) | First spacecraft to orbit another planet (Mars), mapped surface | completed | ||
http://hl7.org/fhir/uv/aerospace/CodeSystem/mars-missions-cs | viking1 | Viking 1 (1975) | First successful Mars landing (July 1976), orbiter and lander mission | completed | ||
http://hl7.org/fhir/uv/aerospace/CodeSystem/mars-missions-cs | viking2 | Viking 2 (1975) | Second successful Mars landing (September 1976), orbiter and lander mission | completed | ||
http://hl7.org/fhir/uv/aerospace/CodeSystem/mars-missions-cs | pathfinder | Mars Pathfinder (1996) | Lander with Sojourner rover, demonstrated airbag landing technology | completed | ||
http://hl7.org/fhir/uv/aerospace/CodeSystem/mars-missions-cs | globalSurveyor | Mars Global Surveyor (1996) | Orbiter that mapped Mars for 10 years with high-resolution cameras | completed | ||
http://hl7.org/fhir/uv/aerospace/CodeSystem/mars-missions-cs | spirit | Spirit Rover (MER-A, 2003) | Mars Exploration Rover, operated 2004-2010, studied Gusev Crater | completed | ||
http://hl7.org/fhir/uv/aerospace/CodeSystem/mars-missions-cs | opportunity | Opportunity Rover (MER-B, 2003) | Mars Exploration Rover, operated 2004-2018, studied Meridiani Planum | completed | ||
http://hl7.org/fhir/uv/aerospace/CodeSystem/mars-missions-cs | phoenix | Phoenix (2007) | Polar lander, confirmed water ice in regolith in 2008 | completed | ||
http://hl7.org/fhir/uv/aerospace/CodeSystem/mars-missions-cs | curiosity | Curiosity (MSL, 2011) | Nuclear-powered rover, landed August 2012, studying habitability in Gale Crater | |||
http://hl7.org/fhir/uv/aerospace/CodeSystem/mars-missions-cs | perseverance | Perseverance (Mars 2020) | Rover collecting samples for future return, includes MOXIE oxygen experiment, landed Feb 2021 | |||
http://hl7.org/fhir/uv/aerospace/CodeSystem/mars-missions-cs | marsSampleReturn | Mars Sample Return (planned ~2030s) | Future mission to return samples collected by Perseverance via orbiter and fetch rover | planned | ||
http://hl7.org/fhir/uv/aerospace/CodeSystem/mars-missions-cs | firstCrewedMars | First Crewed Mars Mission (planned late 2030s) | NASA Artemis-era goal to send astronauts to Mars orbit or surface | planned |
Explanation of the columns that may appear on this page:
| Level | A few code lists that FHIR defines are hierarchical - each code is assigned a level. In this scheme, some codes are under other codes, and imply that the code they are under also applies |
| System | The source of the definition of the code (when the value set draws in codes defined elsewhere) |
| Code | The code (used as the code in the resource instance) |
| Display | The display (used in the display element of a Coding). If there is no display, implementers should not simply display the code, but map the concept into their application |
| Definition | An explanation of the meaning of the concept |
| Comments | Additional notes about how to use the code |