<PlanDefinition xmlns="http://hl7.org/fhir">
<id value="MarsDirectMissionPlan2040"/>
<meta>
<profile
value="https://mitre.org/fhir/space-health/StructureDefinition/mission-timeline-plan"/>
</meta>
<text>
<status value="extensions"/>
<div xmlns="http://www.w3.org/1999/xhtml">
<div>
<table class="grid dict">
<tr>
<th scope="row"><b>Id: </b></th>
<td style="padding-left: 4px;">MarsDirectMissionPlan2040</td>
</tr>
<tr>
<th scope="row"><b>Url: </b></th>
<td style="padding-left: 4px;"><a href="PlanDefinition-MarsDirectMissionPlan2040.html">Mars Direct Mission 2040 - Jezero Crater Landing</a></td>
</tr>
<tr>
<th scope="row"><b>Version: </b></th>
<td style="padding-left: 4px;">0.5.12</td>
</tr>
<tr>
<th scope="row"><b>Title: </b></th>
<td style="padding-left: 4px;">Mars Direct Mission 2040 - Jezero Crater Landing</td>
</tr>
<tr>
<th scope="row"><b>Type: </b></th>
<td style="padding-left: 4px;">
<p style="margin-bottom: 5px;">
<b>system: </b> <span><a href="http://terminology.hl7.org/7.1.0/CodeSystem-plan-definition-type.html">http://terminology.hl7.org/CodeSystem/plan-definition-type</a></span>
</p>
<p style="margin-bottom: 5px;">
<b>code: </b> <span>workflow-definition</span>
</p>
</td>
</tr>
<tr>
<th scope="row"><b>Date: </b></th>
<td style="padding-left: 4px;">2026-03-25 00:24:16-0500</td>
</tr>
<tr>
<th scope="row"><b>Publisher: </b></th>
<td style="padding-left: 4px;">MITRE</td>
</tr>
<tr>
<th scope="row"><b>Description: </b></th>
<td style="padding-left: 4px;"><div><p>Mars Direct architecture mission with ERV pre-deployed, ISRU propellant production for return, crew of 4, 18-month surface operations at Jezero Crater. Mission objectives: demonstrate ISRU viability, conduct extensive geological surveys, collect samples for analysis, validate long-duration Mars surface systems.</p>
</div></td>
</tr>
<tr>
<th scope="row"><b>Actions: </b></th>
<td style="padding-left: 4px;">
<table class="grid-dict">
<tr>
<td>
<b> Launch - Earth Return Vehicle (ERV):</b> Uncrewed ERV launch with Sabatier reactor, nuclear power unit, hydrogen supply. Target: Mars arrival 6 months later, land at Jezero. Begin ISRU propellant production immediately.
<br/>
</td>
</tr>
<tr>
<td>
<b> Launch - Crew in Mars Habitat Unit:</b> Crew of 4 launches 26 months after ERV (once ISRU confirms propellant production). 6-month transit with artificial gravity tether.
<br/>
</td>
</tr>
<tr>
<td>
<b> Outbound Transit:</b> 6-month deep space cruise. Continuous radiation monitoring, exercise countermeasures, health assessments, crew training for surface operations.
<br/>
</td>
</tr>
<tr>
<td>
<b> Mars Orbit Insertion and Descent:</b> Direct entry and landing at Jezero site near pre-positioned ERV. Habitat establishes life support upon landing.
<br/>
</td>
</tr>
<tr>
<td>
<b> Surface Operations - 18 Months:</b> Extended surface mission with ~400-500 EVAs total. Geological surveys, sample collection, ISRU monitoring, equipment maintenance, health monitoring. Weekly medical checkups, monthly radiation assessments.
<br/>
</td>
</tr>
<tr>
<td>
<b> Ascent and Earth Return:</b> Crew boards fueled ERV, launches from Mars, 6-month return transit. Total mission duration: ~30 months (900 days).
<br/>
</td>
</tr>
<tr>
<td>
<b> Earth Atmospheric Entry and Recovery:</b> ERV capsule atmospheric entry, parachute descent, splashdown in Pacific. Crew medical evaluation and reconditioning.
<br/>
</td>
</tr>
</table>
</td>
</tr>
</table>
</div>
</div>
</text>
<extension
url="http://hl7.org/fhir/uv/aerospace/StructureDefinition/mission-context">
<valueReference>🔗
<reference value="Encounter/MarsDirectMission2040"/>
</valueReference>
</extension>
<url
value="https://mitre.org/fhir/space-health/PlanDefinition/MarsDirectMissionPlan2040"/>
<version value="0.5.12"/>
<title value="Mars Direct Mission 2040 - Jezero Crater Landing"/>
<type>
<coding>
<system
value="http://terminology.hl7.org/CodeSystem/plan-definition-type"/>
<code value="workflow-definition"/>
</coding>
</type>
<status value="active"/>
<date value="2026-03-25T00:24:16-05:00"/>
<publisher value="MITRE"/>
<contact>
<name value="MITRE"/>
<telecom>
<system value="url"/>
<value value="https://www.mitre.org/"/>
</telecom>
</contact>
<description
value="Mars Direct architecture mission with ERV pre-deployed, ISRU propellant production for return, crew of 4, 18-month surface operations at Jezero Crater. Mission objectives: demonstrate ISRU viability, conduct extensive geological surveys, collect samples for analysis, validate long-duration Mars surface systems."/>
<action>
<title value="Launch - Earth Return Vehicle (ERV)"/>
<description
value="Uncrewed ERV launch with Sabatier reactor, nuclear power unit, hydrogen supply. Target: Mars arrival 6 months later, land at Jezero. Begin ISRU propellant production immediately."/>
</action>
<action>
<title value="Launch - Crew in Mars Habitat Unit"/>
<description
value="Crew of 4 launches 26 months after ERV (once ISRU confirms propellant production). 6-month transit with artificial gravity tether."/>
</action>
<action>
<title value="Outbound Transit"/>
<description
value="6-month deep space cruise. Continuous radiation monitoring, exercise countermeasures, health assessments, crew training for surface operations."/>
</action>
<action>
<title value="Mars Orbit Insertion and Descent"/>
<description
value="Direct entry and landing at Jezero site near pre-positioned ERV. Habitat establishes life support upon landing."/>
</action>
<action>
<title value="Surface Operations - 18 Months"/>
<description
value="Extended surface mission with ~400-500 EVAs total. Geological surveys, sample collection, ISRU monitoring, equipment maintenance, health monitoring. Weekly medical checkups, monthly radiation assessments."/>
</action>
<action>
<title value="Ascent and Earth Return"/>
<description
value="Crew boards fueled ERV, launches from Mars, 6-month return transit. Total mission duration: ~30 months (900 days)."/>
</action>
<action>
<title value="Earth Atmospheric Entry and Recovery"/>
<description
value="ERV capsule atmospheric entry, parachute descent, splashdown in Pacific. Crew medical evaluation and reconditioning."/>
</action>
</PlanDefinition>