{"resourceType":"Goal","id":"artemis-goal-launches-through-2028","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-launches-through-2028"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Campaign Goal"}],"priority":{"text":"high"},"description":{"text":"Achieve 25 launches during the Artemis lunar campaign phase now through 2028."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"target":[{"measure":{"text":"launches"},"detailQuantity":{"value":25,"unit":"launches","system":"http://unitsofmeasure.org","code":"{launch}"}}],"note":[{"text":"Derived from Artemis Ignite conference screenshot labeled 'Now through 2028'."}]}
{"resourceType":"Goal","id":"artemis-goal-landings-through-2028","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-landings-through-2028"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Campaign Goal"}],"priority":{"text":"high"},"description":{"text":"Achieve 21 lunar landings during the Artemis lunar campaign phase now through 2028."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"target":[{"measure":{"text":"lunar landings"},"detailQuantity":{"value":21,"unit":"landings","system":"http://unitsofmeasure.org","code":"{landing}"}}],"note":[{"text":"Derived from Artemis Ignite conference screenshot labeled 'Now through 2028'."}]}
{"resourceType":"Goal","id":"artemis-goal-surface-payload-through-2028","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-surface-payload-through-2028"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Campaign Goal"}],"priority":{"text":"high"},"description":{"text":"Deliver approximately 4,000 kg of payload to the lunar surface during the Artemis campaign phase now through 2028."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"target":[{"measure":{"text":"payload delivered to lunar surface"},"detailQuantity":{"value":4000,"unit":"kg","system":"http://unitsofmeasure.org","code":"kg"}}],"note":[{"text":"Derived from Artemis Ignite conference screenshot labeled 'Now through 2028'."}]}
{"resourceType":"Goal","id":"artemis-goal-orbital-comm-constellations-through-2028","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-orbital-comm-constellations-through-2028"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Campaign Goal"}],"priority":{"text":"high"},"description":{"text":"Deploy 2 lunar orbital communication satellite constellations during the Artemis campaign phase now through 2028."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"target":[{"measure":{"text":"lunar orbital communication satellite constellations"},"detailQuantity":{"value":2,"unit":"constellations","system":"http://unitsofmeasure.org","code":"{constellation}"}}],"note":[{"text":"Derived from Artemis Ignite conference screenshot labeled 'Now through 2028'."}]}
{"resourceType":"Goal","id":"artemis-goal-launches-2029-2033","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-launches-2029-2033"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Campaign Goal"}],"priority":{"text":"high"},"description":{"text":"Achieve 27 launches during the Artemis lunar campaign phase 2029 through 2033."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"target":[{"measure":{"text":"launches"},"detailQuantity":{"value":27,"unit":"launches","system":"http://unitsofmeasure.org","code":"{launch}"}}],"note":[{"text":"Derived from Artemis Ignite conference screenshot labeled '2029–2033'."}]}
{"resourceType":"Goal","id":"artemis-goal-landings-2029-2033","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-landings-2029-2033"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Campaign Goal"}],"priority":{"text":"high"},"description":{"text":"Achieve 24 lunar landings during the Artemis lunar campaign phase 2029 through 2033."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"target":[{"measure":{"text":"lunar landings"},"detailQuantity":{"value":24,"unit":"landings","system":"http://unitsofmeasure.org","code":"{landing}"}}],"note":[{"text":"Derived from Artemis Ignite conference screenshot labeled '2029–2033'."}]}
{"resourceType":"Goal","id":"artemis-goal-rovers-2029-2033","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-rovers-2029-2033"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Campaign Goal"}],"priority":{"text":"high"},"description":{"text":"Deploy 7 rovers during the Artemis lunar campaign phase 2029 through 2033."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"target":[{"measure":{"text":"rovers deployed"},"detailQuantity":{"value":7,"unit":"rovers","system":"http://unitsofmeasure.org","code":"{rover}"}}],"note":[{"text":"Derived from Artemis Ignite conference screenshot labeled '2029–2033'."}]}
{"resourceType":"Goal","id":"artemis-goal-surface-payload-2029-2033","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-surface-payload-2029-2033"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Campaign Goal"}],"priority":{"text":"high"},"description":{"text":"Deliver approximately 60,000 kg of payload to the lunar surface during the Artemis campaign phase 2029 through 2033."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"target":[{"measure":{"text":"payload delivered to lunar surface"},"detailQuantity":{"value":60000,"unit":"kg","system":"http://unitsofmeasure.org","code":"kg"}}],"note":[{"text":"Derived from Artemis Ignite conference screenshot labeled '2029–2033'."}]}
{"resourceType":"Goal","id":"artemis-goal-launches-2033-2036","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-launches-2033-2036"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Campaign Goal"}],"priority":{"text":"high"},"description":{"text":"Achieve 29 launches during the Artemis lunar campaign phase 2033 through 2036."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"target":[{"measure":{"text":"launches"},"detailQuantity":{"value":29,"unit":"launches","system":"http://unitsofmeasure.org","code":"{launch}"}}],"note":[{"text":"Derived from Artemis Ignite conference screenshot labeled '2033–2036'."}]}
{"resourceType":"Goal","id":"artemis-goal-landings-2033-2036","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-landings-2033-2036"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Campaign Goal"}],"priority":{"text":"high"},"description":{"text":"Achieve 28 lunar landings during the Artemis lunar campaign phase 2033 through 2036."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"target":[{"measure":{"text":"lunar landings"},"detailQuantity":{"value":28,"unit":"landings","system":"http://unitsofmeasure.org","code":"{landing}"}}],"note":[{"text":"Derived from Artemis Ignite conference screenshot labeled '2033–2036'."}]}
{"resourceType":"Goal","id":"artemis-goal-rovers-2033-2036","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-rovers-2033-2036"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Campaign Goal"}],"priority":{"text":"high"},"description":{"text":"Deploy 4 rovers during the Artemis lunar campaign phase 2033 through 2036."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"target":[{"measure":{"text":"rovers deployed"},"detailQuantity":{"value":4,"unit":"rovers","system":"http://unitsofmeasure.org","code":"{rover}"}}],"note":[{"text":"Derived from Artemis Ignite conference screenshot labeled '2033–2036'."}]}
{"resourceType":"Goal","id":"artemis-goal-surface-payload-2033-2036","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-surface-payload-2033-2036"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Campaign Goal"}],"priority":{"text":"high"},"description":{"text":"Deliver approximately 150,000 kg of payload to the lunar surface during the Artemis campaign phase 2033 through 2036."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"target":[{"measure":{"text":"payload delivered to lunar surface"},"detailQuantity":{"value":150000,"unit":"kg","system":"http://unitsofmeasure.org","code":"kg"}}],"note":[{"text":"Derived from Artemis Ignite conference screenshot labeled '2033–2036'."}]}

{"resourceType":"Goal","id":"artemis-goal-end-to-end-logistics-crewed-operations","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-end-to-end-logistics-crewed-operations"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"high"},"description":{"text":"Establish end-to-end logistics services in support of crewed lunar surface operations."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"note":[{"text":"Derived from Artemis Ignite logistics slide: 'End-to-end logistics services in support of crewed operations'."}]}
{"resourceType":"Goal","id":"artemis-goal-logistics-support-4-crew-28-day-mission","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-logistics-support-4-crew-28-day-mission"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"high"},"description":{"text":"Provide approximately 8,000 kg of carriers, consumables, and other logistics items to support a 4-crew, 28-day lunar surface mission."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"target":[{"measure":{"text":"logistics mass to support 4-crew 28-day mission"},"detailQuantity":{"value":8000,"unit":"kg","system":"http://unitsofmeasure.org","code":"kg"}}],"note":[{"text":"Derived from Artemis Ignite logistics slide: 'Example of mass needed: ~8,000 kg ... to support a 4-crew, 28-day mission.'"}]}
{"resourceType":"Goal","id":"artemis-goal-deploy-operate-dispose-logistics-systems","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-deploy-operate-dispose-logistics-systems"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"medium"},"description":{"text":"Deploy, operate, and dispose of systems needed to deliver, transfer, sustain, utilize, and dispose of logistics items in support of lunar surface crew operations."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"note":[{"text":"Derived from Artemis Ignite logistics slide language describing lifecycle support for logistics systems."}]}

{"resourceType":"Goal","id":"artemis-goal-continuous-human-presence","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-continuous-human-presence"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"high"},"description":{"text":"Enable a continuous human presence on the lunar surface through increased habitable volume and floor space."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"note":[{"text":"Derived from Artemis Ignite habitats slide: 'Enable a continuous human presence with increased habitable volume and floor space'."}]}
{"resourceType":"Goal","id":"artemis-goal-multiple-habitable-volumes","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-multiple-habitable-volumes"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"high"},"description":{"text":"Establish multiple habitable volumes across multiple lunar site locations."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"note":[{"text":"Derived from Artemis Ignite habitats slide: 'Multiple habitable volumes across multiple site locations'."}]}
{"resourceType":"Goal","id":"artemis-goal-expand-surface-science-and-utilization","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-expand-surface-science-and-utilization"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"medium"},"description":{"text":"Expand lunar surface science and utilization capabilities through habitat infrastructure and associated systems."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"note":[{"text":"Derived from Artemis Ignite habitats slide: 'Expands surface science and utilization capabilities'."}]}
{"resourceType":"Goal","id":"artemis-goal-increase-earth-independent-operations","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-increase-earth-independent-operations"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"high"},"description":{"text":"Increase Earth-independent lunar surface operations."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"note":[{"text":"Derived from Artemis Ignite habitats slide: 'Increase Earth-independent operations'."}]}

{"resourceType":"Goal","id":"artemis-goal-cargo-return-phase-2-demo","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-cargo-return-phase-2-demo"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"medium"},"description":{"text":"Demonstrate cargo return from the lunar surface during Phase 2."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"note":[{"text":"Derived from Artemis Ignite cargo return slide: 'Initial demo in Phase 2'."}]}
{"resourceType":"Goal","id":"artemis-goal-cargo-return-phase-3-500kg","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-cargo-return-phase-3-500kg"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"high"},"description":{"text":"Implement lunar cargo return capability in Phase 3 with a return mass goal of 500 kg."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"target":[{"measure":{"text":"cargo return mass from lunar surface"},"detailQuantity":{"value":500,"unit":"kg","system":"http://unitsofmeasure.org","code":"kg"}}],"note":[{"text":"Derived from Artemis Ignite cargo return slide: 'Phase 3: implement capability with mass goal of 500 kg'."}]}
{"resourceType":"Goal","id":"artemis-goal-uncrewed-cargo-return-science","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-uncrewed-cargo-return-science"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"medium"},"description":{"text":"Support uncrewed cargo return missions for science returns from the lunar surface."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"note":[{"text":"Derived from Artemis Ignite cargo return slide listing science returns as a cargo return mission purpose."}]}
{"resourceType":"Goal","id":"artemis-goal-uncrewed-cargo-return-critical-hardware","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-uncrewed-cargo-return-critical-hardware"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"medium"},"description":{"text":"Support uncrewed cargo return missions for recovery of critical hardware from the lunar surface."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"note":[{"text":"Derived from Artemis Ignite cargo return slide listing critical hardware as a cargo return mission purpose."}]}

{"resourceType":"Goal","id":"artemis-goal-isru-phase-1-2-demo","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-isru-phase-1-2-demo"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"high"},"description":{"text":"Demonstrate in-situ resource utilization technologies and operations during Phases 1 and 2."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"note":[{"text":"Derived from Artemis Ignite ISRU slide: 'Phase 1 & 2 experiment & demo'."}]}
{"resourceType":"Goal","id":"artemis-goal-isru-phase-3-implementation","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-isru-phase-3-implementation"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"high"},"description":{"text":"Continue ISRU demonstration and begin operational implementation during Phase 3."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"note":[{"text":"Derived from Artemis Ignite ISRU slide: 'Phase 3 continue demo and begin implementation'."}]}
{"resourceType":"Goal","id":"artemis-goal-isru-reduce-launch-mass-cost-risk","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-isru-reduce-launch-mass-cost-risk"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"high"},"description":{"text":"Reduce launch mass, cost, and risk to human exploration through the use of lunar commodities enabled by ISRU."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"note":[{"text":"Derived from Artemis Ignite ISRU slide language stating that use of lunar commodities could reduce launch mass, cost, and risk to human exploration."}]}
{"resourceType":"Goal","id":"artemis-goal-isru-produce-lunar-commodities","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-isru-produce-lunar-commodities"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"high"},"description":{"text":"Produce useful lunar commodities from regolith, including oxygen, water, rare Earth elements, and hydrogen."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"note":[{"text":"Derived from Artemis Ignite ISRU slide listing key commodities from regolith."}]}
{"resourceType":"Goal","id":"artemis-goal-isru-produce-durable-materials","identifier":[{"system":"http://hl7.org/fhir/uv/aerospace/goal-identifiers","value":"artemis-goal-isru-produce-durable-materials"}],"lifecycleStatus":"active","category":[{"text":"Artemis Ignite Mission Goal"}],"priority":{"text":"medium"},"description":{"text":"Produce durable and sustainable materials from lunar regolith for surface operations and infrastructure."},"subject":{"reference":"Organization/NASA","display":"NASA (National Aeronautics and Space Administration)"},"note":[{"text":"Derived from Artemis Ignite ISRU slide describing conversion of regolith into durable and sustainable materials."}]}